Started:
November 1999
Completed: August 2000
Type: 25'-3" x 8'-6"
Powerboat
Link to Surf Scoter 26 Page
in Design Catalog |

|
The
1/2 plywood panels are laid up over the bulkheads,
and the chine log and sheer clamp are installed as
we go. |

|
An
extra 1/4" layer is cold molded on the bottom of the
hull and the keel is set in place.
|

|
All
the bulkheads are in place and the interior is
primed. The cabin sides and front facets are going
to be left bright so they were added after primer.
We will mask them for the interior painting.
|

|
The
hull and superstructure are completed (glassed and
epoxy sealed), then the boat is primed and painted.
|

|
A
135 Volvo Penta I/O Duo Prop diesel is installed.
All exterior wood trim is mahogany with a Cetol
finish.
|
|
|
|
|
|
|
|
|
|
|
|
|